Views: 0 Author: Site Editor Publish Time: 2021-11-17 Origin: Site
On October 26, the production of two fuel tanker trucks ordered by the Vietnamese customer has been completed. These two tanks are made of aluminum with a volume of 30cbm. It took 60 days from the customer ordered them to the delivery.
The tanker has a 371 horsepower engine, Euro standard manhole,and the diameter of manhole cover is 500mm. And fire extinguishers, two oil pipes and anti-static electricity earthing device are equipped.